Easy RFP
EASYHOTELRFP.COM
GROUP-BLOCK WORKFLOW · 50–100 ROOMS
v2026.05

47 manual steps vs 11 automated steps

Sourcing a 50–100 room group block, side by side. Print this page or save as PDF and share with your stakeholder before the next briefing call.

Manual workflow

47 steps · 18–24 h

Phase 1 — Briefing
  1. Capture event dates, attendees, room-nights, meeting spacelow
  2. Confirm budget and cost-centrelow
  3. Identify F&B headcount expectationsmed
  4. Confirm group transport assumptionslow
  5. Draft brief in Word or Google Docmed
  6. Email brief to stakeholder for sign-offlow
  7. Action two-or-three rounds of editsmed
  8. Lock and version the final briefmed
Phase 2 — Comp-set + outreach
  1. List candidate hotels from memoryhigh
  2. Open last year's contract foldermed
  3. Cross-reference brand standard and radiusmed
  4. Look up each hotel's group sales contacthigh
  5. Confirm the contact is still in rolehigh
  6. Draft individual outreach emailsmed
  7. Send the first wave (6–10 hotels)low
  8. Log each send in a spreadsheetmed
  9. Wait 5–7 business dayslow
  10. Chase non-respondents on day 4med
  11. Chase again on day 8med
  12. Add backup hotels for declinesmed
Phase 3 — Bid intake + comparison
  1. Receive bid 1 — PDF, varied formathigh
  2. Receive bid 2 — embedded in emailhigh
  3. Receive bid 3 — Excel attachmenthigh
  4. Receive bid 4 — polite nolow
  5. Receive bid 5 — partial bidhigh
  6. Transcribe every line item to master sheethigh
  7. Normalise per-room-night rate inclusionshigh
  8. Normalise meeting-room DDR inclusionshigh
  9. Email three hotels for missing fieldsmed
  10. Field two follow-up phone callsmed
  11. Build a scoring matrix in the sheetmed
  12. Apply weighted scoring across criteriamed
  13. Identify top three candidateslow
  14. Share short-list with stakeholderlow
Phase 4 — BAFO + contract
  1. Draft individual BAFO requestsmed
  2. Send BAFO emailslow
  3. Chase BAFO responsesmed
  4. Re-score with the BAFO numbersmed
  5. Select winner with stakeholderlow
  6. Notify unsuccessful hotelsmed
  7. Receive contract draft from winnerlow
  8. Mark up contract clauseshigh
  9. Route through internal legalhigh
Phase 5 — Handover + reconciliation
  1. Build rooming list in Excelmed
  2. Email rooming list to reservationsmed
  3. Field 10–15 rooming-list correctionshigh
  4. Reconcile pickup, F&B and attritionmed
  5. File post-event report where findablehigh

Automated workflow

11 steps · 3–4 h

End-to-end
  1. Define the block — structured form for dates, rooms, F&B, meeting space, concessionslow
  2. Build comp-set — pick 6–12 hotels from your saved library; brand-standard and radius are filterslow
  3. Send — one click to all hotels; the platform fills contact owner automaticallylow
  4. Auto-chase — reminders at 72 h and 6 days; declines logged with reason codeslow
  5. Receive normalised bids — one board, fully-loaded per-room-night cost auto-computedlow
  6. Score side by side — saved weighted matrix applied once, reused on every blocklow
  7. Short-list three — move three highest-scoring bids into the BAFO columnlow
  8. Run BAFO — one identical request to all three; delta column versus initial bidlow
  9. Sign contract — export with attrition, cancellation, F&B and concessions pre-filledlow
  10. Hand off rooming list — CSV through the same workflow; hotel confirms in-platformlow
  11. Reconcile post-event — pickup, F&B actuals and attrition logged against the original recordlow
What disappears

Bid-format normalisation. Contact lookup. Spreadsheet rebuild. Manual chasing. Rooming-list corrections cycle. Contract-summary drafting from scratch. The eleven steps above are decisions; the 36 missing steps were transcription, chasing and rework.

Planner hours saved per block
15–21 h
↓ 80–85% labour
Calendar days from brief to contract
21 → 7–9
↓ ~65% lead time
Fully-loaded cost per block
€1,200–1,800
saved at €65/h

Send your next 50–100 room block in 11 steps

Free for the first event. No card. EU-hosted.

Start free →

Sources: Easy RFP shadow study of four European corporate planners through full group-block life cycles (Q4 2024 – Q3 2025) · IBTM World 2025 panel on group sourcing complexity · MPI European Workforce Pulse 2025 · Skift Meetings, European Group Sourcing Trends 2025.

© Easy RFP 2026 · easyhotelrfp.com · Made in Europe