EASY RFP · Switching Cost Worksheet
Back to article

Switching Cost Itemized Worksheet

Version 2026.05
Forrester TEI / Gartner TCO aligned
Easy RFP Editorial
How to use this sheet. Fill in your assumptions in the orange-bordered cells. The six line items recalculate. The scenario block at the bottom flags whether your switch is financially defensible or whether you should stay and renegotiate. Bring the printed sheet to your finance partner and the procurement board.

Section A · Your Assumptions

Section B · Six Line Items

# Line item What's included (and what vendors usually omit) Calc cost Your override (€)
1 Licence overlap 3-month parallel run between incumbent and new vendor. Cannot be zero unless monthly rolling term or perfect gap timing.
2 Data migration SOW + the long tail (custom fields, archived format, attachments, award decisions). Average 66% overrun on SOW.
3 Training (loaded labour) ~14 hrs/user fully loaded: vendor sessions + self-exploration + "I broke it" support time. Not the headline onboarding hours.
4 Productivity dip 30% / 15% / 5% drop across months 1, 2, 3. Per Gartner enterprise software adoption research. The line vendors never quote.
5 Change management Internal comms, champion network, brown-bag sessions, manager 1:1s, board update deck.
6 Integration rebuild SSO / CRM / Calendar / Finance / BI rebuilt against new vendor's API. The other line vendors never quote.
SUBTOTAL · Six itemized line items

Contingency line

Per Forrester TEI guidance, add a risk-adjustment line for unknown unknowns. Default applied below: 20% of subtotal.

Total first-year switching cost

Section C · Scenario Verdict

Section D · Notes for the board pack

Sources & methodology Forrester Research, Total Economic Impact methodology · forrester.com
Gartner, Total Cost of Ownership (TCO) framework · gartner.com
Easy RFP internal benchmark: 7 anonymised enterprise migrations 2024–2026 (mean team 18, mean volume 140 RFPs/year). Methodology available on request.
Ranges are illustrative defaults. Replace with your own quotes in the override column for board-ready accuracy.
© Easy RFP 2026 · Use freely · Attribution appreciated, not required.